Thursday, November 10, 2011

How to Install Base Cabinets 01

Kitchen And Bathroom Renovation : How to Install Base Cabinets 01



Begin the installation with a corner cabinet. Draw plumb lines that intersect the 341⁄2" reference line (measured from the high point of the floor at the locations for the cabinet sides.



Place the cabinet in the corner. Make sure the cabinet is plumb and level. If necessary, adjust by driving wood shims under the cabinet base. Be careful not to damage the flooring. Drill 3⁄16" pilot holes through the hanging strip and into the wall studs. Tack the cabinet to the wall with wood screws or wallboard screws.



Clamp the adjoining cabinet to the corner cabinet. Make sure the new cabinet is plumb, then drill counterbored pilot holes through the cabinet sides or the face frame and filler strip. Screw the cabinets together. Drill 3⁄16" pilot holes through the hanging strips and into the wall studs. Tack the cabinets loosely to the wall studs with wood screws or wallboard screws.



Use a jigsaw to cut any cabinet openings needed in the cabinet backs (for example, in the sink base seen here) for plumbing, wiring, or heating ducts.

No comments:

Post a Comment

Related Posts Plugin for WordPress, Blogger...