Wednesday, October 26, 2011

How To Installing New Kitchen Cabinet

Kitchen And Bathroom Renovation : How To Installing New Kitchen Cabinet

Installing new cabinets is easiest if the kitchen is completely empty. Disconnect the plumbing and wiring, and temporarily remove the appliances. If the new kitchen requires plumbing or electrical changes, now is the time to have this work done. If the kitchen flooring is to be replaced, finish it before beginning the layout and the installation of cabinets. Cabinets must be installed plumb and level. Using a level as a guide, draw reference lines on the walls to indicate cabinet location. If the kitchen floor is uneven, find the highest point of the floor area that will be covered by base cabinets. Measure up from this point to draw reference lines.

Tools & Materials

Stud finder
Pry bar
Trowel
Putty knife
Screwdriver
Straightedge
Level
Marking pencil
Tape measure
1 × 3 boards
Straight 6- to 8-ft.-long
2 × 4
Wallboard compound
21⁄2" wallboard screws

No comments:

Post a Comment

Related Posts Plugin for WordPress, Blogger...